Pls give the sol. as sol. in the mat is very long and unnecessary
Q1 whether this ques contains both size and time disparity
Q2 can we give sol. Directly that in case of size disparity decision is based on npv so project B is selected
Q3 or we have to follw the sol. Of mat
No, u do not need to follow the solution as given in the material.
U can solve the sum as u wish, do not refer the ans as provided in the book.
Sir according to me project A is chosen as there is size disparity and in case of size disparity project is chosen on the basis of Npv.
Is it right sir?